Pictures from Ian and Kat's Digital Camera: Day 63: 2019-04-03
[Up to Kitchen renovation: Early 2019
]
Here are pictures of our new house in Kitchener, taken at various stages.
These are various renovations we did around the house.
We did a major kitchen reno in early 2019.
[1/256 size] [1/64 size] [1/16 size] [1/4 size] [full size (4032 x 3024)]
Comment on this picture (Last update: 4 Apr, 2019)
- Ian works with the electrician to get the wiring for his LED project
installed, mostly in a dedicated space behind the microwave.
Finlay and Luna supervise.
[1/256 size] [1/64 size] [1/16 size] [1/4 size] [full size (4032 x 3024)]
Comment on this picture (Last update: 4 Apr, 2019)
- Fairly cleanly mounted wiring (not fully hooked up yet)
[1/256 size] [1/64 size] [1/16 size] [1/4 size] [full size (4032 x 3024)]
Comment on this picture (Last update: 4 Apr, 2019)
- The LEDs are controlled with a keypad mounted in the drawer above the
microwave. That drawer also contains a USB charging station.
Up to Kitchen renovation: Early 2019
This page last updated: 4 Apr, 2019
Ian Goldberg,
ian@paip.net.
Back to top of Ian and Kat's Digital Camera Pictures