Pictures from Ian and Kat's Digital Camera: Day 63: 2019-04-03
[Up to Kitchen renovation: Early 2019 ]

Here are pictures of our new house in Kitchener, taken at various stages.


These are various renovations we did around the house.
We did a major kitchen reno in early 2019.
[thumbnail] [1/256 size] [1/64 size] [1/16 size] [1/4 size] [full size (4032 x 3024)]
Comment on this picture (Last update: 4 Apr, 2019)
Ian works with the electrician to get the wiring for his LED project installed, mostly in a dedicated space behind the microwave. Finlay and Luna supervise.

[thumbnail] [1/256 size] [1/64 size] [1/16 size] [1/4 size] [full size (4032 x 3024)]
Comment on this picture (Last update: 4 Apr, 2019)
Fairly cleanly mounted wiring (not fully hooked up yet)

[thumbnail] [1/256 size] [1/64 size] [1/16 size] [1/4 size] [full size (4032 x 3024)]
Comment on this picture (Last update: 4 Apr, 2019)
The LEDs are controlled with a keypad mounted in the drawer above the microwave. That drawer also contains a USB charging station.


Up to Kitchen renovation: Early 2019

This page last updated: 4 Apr, 2019


Ian Goldberg, ian@paip.net.
Back to top of Ian and Kat's Digital Camera Pictures