Pictures from Ian and Kat's Digital Camera: Day 10: 2019-01-18
[Up to Kitchen renovation: Early 2019 ]

Here are pictures of our new house in Kitchener, taken at various stages.


These are various renovations we did around the house.
We did a major kitchen reno in early 2019.
[thumbnail] [1/256 size] [1/64 size] [1/16 size] [1/4 size] [full size (4032 x 3024)]
Comment on this picture (Last update: 18 Jan, 2019)
The rest of the bathroom plumbing is now correctly slanted and vented.

[thumbnail] [1/256 size] [1/64 size] [1/16 size] [1/4 size] [full size (4032 x 3024)]
Comment on this picture (Last update: 18 Jan, 2019)
The roof of the back kitchen is slanted, but we want the ceiling to be flat, so they put in extra ceiling beams parallel to the floor.

[thumbnail] [1/256 size] [1/64 size] [1/16 size] [1/4 size] [full size (4032 x 3024)]
Comment on this picture (Last update: 18 Jan, 2019)
In the room under the back kitchen, the framing is pretty much done, including the half of the room that has to have a lower ceiling because something something condensation. The plumbing connecting the kitchen drain to the stack is also complete.

[thumbnail] [1/256 size] [1/64 size] [1/16 size] [1/4 size] [full size (4032 x 3024)]
Comment on this picture (Last update: 18 Jan, 2019)


Up to Kitchen renovation: Early 2019

This page last updated: 18 Jan, 2019


Ian Goldberg, ian@paip.net.
Back to top of Ian and Kat's Digital Camera Pictures