Prev Up Next Out [1/256 Zoom] In
Today's main task was putting up the beam that will replace the wall between the kitchen and the dining room. The HVAC and electrical people were here removing the wires and venting that were going through the wall. The upshot is that we won't have heat in our bathroom until Monday.